Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.
키워드
Research reactor; Scheduling optimization; Safety; Dismantling procedure; Research reactor; Scheduling optimization; Safety; Dismantling procedure
- 제목
- 연구로 안전 해체를 위한 스케쥴링 최적화
- 제목 (타언어)
- Scheduling Optimization for Safety Decommissioning of Research Reactor
- 저자
- 김태성; 이종환; 장성호; 김상호; 박희성
- 발행일
- 2006
- 저널명
- 대한안전경영과학회지
- 권
- 8
- 호
- 4
- 페이지
- 67 ~ 75
- 출판사
- 대한안전경영과학회
- 발행국가
- 대한민국
- 분량
- 9 페이지
- ISSN
- P 1229-6783